
Sea Freight: Industrial Machinery from China to Durban
Shanghai, China Β βΒ Durban, South Africa
Example β sample case study for layoutThe challenge
The client needed oversized machinery moved from a supplier in Shanghai to their plant in Gauteng, with the equipment commissioned on a fixed install date. Any customs delay at Durban would have pushed back the whole installation.
What we did
We booked the FCL space, prepared the full import documentation up front, and lodged the customs entry before the vessel berthed so clearing started the moment the container landed. We arranged road haulage from Durban to the plant.
The outcome
The container cleared customs without a hold and the machinery reached the factory ahead of the install date. The client now routes their China imports through us.
More work
Other case studies.
ExampleAir Freight: Time-Sensitive Electronics from Turkey to Johannesburg
Istanbul, Turkey β Johannesburg, South Africa
Read case study
ExampleCustoms Clearing: Cross-Border Cargo via Beitbridge
Johannesburg, South Africa β Harare, Zimbabwe
Read case study
ExampleDoor-to-Door: Consolidated Cargo from China to Lusaka
Guangzhou, China β Lusaka, Zambia
Read case study